欢迎进入山东恒能环保能源设备有限公司

热线电话

0531-69953988

分类导航
产品展示
联系我们
山东恒能环保能源设备有限公司

联系电话:18678860671

服务热线:0531-69953988

联系地址:山东省济南市高新区舜泰广场9号南楼201室

生物脱硫相关液位控制方法

①预处理水封井排水标准,液位到达池口20-50cm时进行排水,排潜水泵露出顶部停止排水,排水不定期。

① The drainage standard of the pre-treatment water sealed well is that when the liquid level reaches 20-50cm at the pool mouth, the water shall be drained until the top of the submersible pump is exposed, and the drainage shall be stopped irregularly.
②废水井排水,在液下泵无自动情况下,液位到达池口20-50cm时进行排水,排潜水泵露出顶部停止排水,排水不定期;目前液下泵自动运行,关液下泵运行状况即可。
② The waste water well shall be drained when the liquid level reaches 20-50cm at the pool mouth when the submerged pump is not automatic, and the drainage shall be stopped when the submersible pump is exposed to the top, and the drainage shall be irregular; At present, the submerged pump operates automatically, and the operation status of the submerged pump can be turned off.
③洗涤塔运行中液位到达400m进行补水,补800m后,停止补水,开关水阅即可洗涤塔补水期间严禁人员离开,补水结束后方可离开,以免发生洗涤塔高液位,水倒罐沼气管道,造成水培。 ④气柜水封井在液位到达潜水泵四分之三处,进行排水,闭合AA1配电柜中QF119,启动水泵,液位到达潜水泵露出三分之二,拉下QF119,停止排水。
③ Make up water when the liquid level of the washing tower reaches 400m during operation. After making up to 800m, stop making up water and turn on and off the water. Personnel are strictly prohibited to leave during the water making up of the washing tower. Only after the water making up is completed can they leave, so as to avoid high liquid level of the washing tower and water pouring into the biogas pipeline, resulting in hydroponic culture. ④ When the liquid level of the water seal well of the gas holder reaches three-quarters of the submersible pump, drain the water, close qf119 in Aa1 distribution cabinet, start the water pump, when the liquid level reaches two-thirds of the submersible pump, pull down qf119 and stop drainage.
⑤再*池补排水、补水:开启再生池补水手阀,再开启*化水总即可,待液位补目标液位时,-**先关闭软*水总阀,再关闭再生池补水阀,排水:开启老沉淀池进料阀,开启循环泵到老沉淀池手阀,开度50%以下开度超过50%会影响喷淋流量,造成塔内吸收效果变差,出口硫化氢超标,排目标液位依次关闭相应手阀即。
⑤ Make up drainage and water in the regeneration tank: open the make-up sailor valve of the regeneration tank, and then open the total chemical water. When the liquid level is made up to the target liquid level, - * * close the main soft water valve first, and then close the make-up valve of the regeneration tank. Drainage: open the feed valve of the old sedimentation tank, and open the hand valve from the circulating pump to the old sedimentation tank. The opening is less than 50%, and the opening exceeding 50% will affect the spray flow, resulting in poor absorption effect in the tower and excessive hydrogen sulfide at the outlet, Discharge to the target liquid level and close the corresponding hand valve in turn.
注:水封井液位每日巡检一次即可,雨雪天气,*大巡检频率,以免水封井液位过高,造成气路水堵,导致气柜丧失缓冲能力。
Note: the liquid level of the water seal well can be inspected once a day. In rainy and snowy weather, * the inspection frequency should be increased to avoid the high liquid level of the water seal well, resulting in water blockage in the gas path and loss of buffer capacity of the gas holder.
以上就是为大家介绍的有关生物脱硫https://www.hneee.net的详细的介绍,希望对您有所帮助.如果您有什么疑问的话,欢迎联系我们.我们将以的态度,为您提供服务
The above is about biological desulfurization https://www.hneee.net I hope it will be helpful to you If you have any questions, please contact us We will provide you with professional service

相关产品 我们的存在,是为了更好的服务于沼气等可燃气体净化及利用行业